User Tools

Site Tools


news

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revisionBoth sides next revision
news [2022/11/22 08:53] aorthnews [2022/11/22 08:54] aorth
Line 5: Line 5:
  
 ===== November 15, 2022: planned maintenance/upgrade ===== ===== November 15, 2022: planned maintenance/upgrade =====
- 
-Dear HPC users,                                                      2022-11-15 
  
 We are planning to upgrade the operating system on the HPC head node. This will bring the OS from CentOS 7 to CentOS Stream 8, which is the same upgrade we did on all compute nodes several months ago. The maintenance will take place on: We are planning to upgrade the operating system on the HPC head node. This will bring the OS from CentOS 7 to CentOS Stream 8, which is the same upgrade we did on all compute nodes several months ago. The maintenance will take place on:
  
-                **Friday, November 25th @ 2–5PM**+                         Friday, November 25th @ 2–5PM
  
 Any SLURM jobs that are still running will be re-queued and held until after the maintenance is over. The cluster will be inaccessible during this time. Any SLURM jobs that are still running will be re-queued and held until after the maintenance is over. The cluster will be inaccessible during this time.
news.txt · Last modified: 2023/05/02 12:47 by aorth