news
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revision | Next revisionBoth sides next revision | ||
news [2022/11/22 08:53] – aorth | news [2022/11/22 08:54] – aorth | ||
---|---|---|---|
Line 5: | Line 5: | ||
===== November 15, 2022: planned maintenance/ | ===== November 15, 2022: planned maintenance/ | ||
- | |||
- | Dear HPC users, | ||
We are planning to upgrade the operating system on the HPC head node. This will bring the OS from CentOS 7 to CentOS Stream 8, which is the same upgrade we did on all compute nodes several months ago. The maintenance will take place on: | We are planning to upgrade the operating system on the HPC head node. This will bring the OS from CentOS 7 to CentOS Stream 8, which is the same upgrade we did on all compute nodes several months ago. The maintenance will take place on: | ||
- | **Friday, November 25th @ 2–5PM** | + | Friday, November 25th @ 2–5PM |
Any SLURM jobs that are still running will be re-queued and held until after the maintenance is over. The cluster will be inaccessible during this time. | Any SLURM jobs that are still running will be re-queued and held until after the maintenance is over. The cluster will be inaccessible during this time. |
news.txt · Last modified: 2023/05/02 12:47 by aorth